Heylo Logo

Heywall Australia Professional kit

(No reviews yet) Write a Review
SKU:
Kit-HWA-Pro
  • Heylo HeyWall Australia Professional Kit
  • Heylo extension system bars
  • Heylo sealing rails
  • Heylo angle adaptor
  • Heylo self-adhesive zipper
  • Heylo quick release adaptors
  • Heylo side clamps
  • Heylo carrying bag
  • Clear plastic roll (80 micrometers)
  • Curtain-Wall Permafix film knife
  • All-in-One tape
  • Blue masking tape
  • Black cloth tape
$1,760.00

THIS KIT INCLUDES:


Description

HEYWALL - The clever dust protection system for subspaces

Check out the video tab for more information

Need fast and flexible protection against dust during renovations? And without time-consuming masking to cover doors, windows and furniture?

  • Quick and flexible protection against dust with HEYWALL dust control wall
  • For separating walls, ceilings and partial areas
  • Module system - individual modules for different applications
  • No covering or masking of doors, windows and furniture
  • For up to 3.60 m ceiling height
  • Build up in a few minutes
  • Tool-less use and easy to set up without a ladder
  • No post-cleaning
  • No disposal costs

The dust protection wall HEYWALL ensures clean rooms during restoration or renovation work and avoids annoying re-cleaning. The module system includes aluminium poles up to 3.60 m high, which creates a dust-tight barrier due to a foil and a convenient entrance or exit by a self-adhesive zipper (220 cm long). It can be set up as a room divider, in L or U shape or as a polygon. All angles are possible.

HeyWall Dust containment system

The Heylo Restore Solutions Professional Kit includes:

Installation Steps 

1. Open bag pull out pole and push into base.

2. Screw in the quick release spring loaded adaptor

3. Screw in top piece that holds plastic 

4. Top piece pull back locking flap then the 2 holes underneath push up to lift flap to lock in plastic then close locking flap. 

5. To install zipper stick zipper to the plastic once erected then open zipper then use knife to cut plastic then zipper is ready to use 

7. Use Ceiling rails with the side clamps make sure pole is 23cm to 29cm from the wall to attach the plastic to the wall.

Use of Restore Solutions tape can also help.

 

Accessories available for HEYWALL

  • Extendable system bars made of aluminium including head and foot plates: Fix the head and foot plate to the system bar. Clamp the foil into the top plate. Then tighten the system pole to the desired length between floor and ceiling by pulling it out.
  • Sealing rails incl. ceiling clamps: For application on ceilings, use the sealing rail and ceiling clamps; Use sealing rail with side clamp for wall closure.
  • Side clamps: These create a wall closure together with the sealing rails. First, connect the side clamp to the sealing rail. Then connect the sealing rail and the side clamp at the appropriate height to the system bar.
  • Angle adaptor: For fixing the system bars to inclined walls. Screw the angle adapter onto the system bar, and then screw the head plate onto the angle adapter. Then clamp the system bar between the floor and the slant.
  • Self-adhesive zippers: For application on the plastic foil. For easy entry and exit of the construction site. Stick the zipper and cut the film for the passage.
  • Carrying bag: bag with sturdy zipper for stable transport and handling, as well as an integrated bag for accessories. The washable surface inside and outside.
View AllClose

Spare Parts

  • Product
  • Qty in Cart
  • Quantity
  • Price
  • Subtotal
  • Total: items /

Adding your products to cart

Specifications

Product Type:
Packages
Product Type:
Doors & Walls
View AllClose

Resources

View AllClose

0 Reviews

View AllClose